Murphy Exploration and Production Company
Gulf of Mexico
Installation of a five-mile, four-inch gas lift pipeline, 250-foot flexible jumper and modification of the existing Thunderhawk manifold pigging loop.
Services Provided
- Design engineering of gas lift pipeline and modified pigging loop tie-in extension
- Dual hot stab ROV panel design for pigging loop
- Pipeline ROW permitting support
- Part of the Murphy integrated project team
- Installation engineering support
Scope
- Design Engineering
- ROW
- Permitting Support
- Installation Engineering Support