Murphy Exploration and Production Company

Gulf of Mexico
Installation of a five-mile, four-inch gas lift pipeline, 250-foot flexible jumper and modification of the existing Thunderhawk manifold pigging loop.

Services Provided

  • Design engineering of gas lift pipeline and modified pigging loop tie-in extension
  • Dual hot stab ROV panel design for pigging loop
  • Pipeline ROW permitting support
  • Part of the Murphy integrated project team
  • Installation engineering support

Scope

  • Design Engineering
  • ROW
  • Permitting Support